RC Twin Rib Bridge: Span
15/18/13/13/15/12m
|
|
USJ-KESAS Flyover, Selangor: RC Twin Rib Integral
Bridge (Completed)
 |
Analysed and Designed RC full integral bridge with twin rib on pile bent
foundations. |
 |
Designed abutment with monolithic connections and pile bent, 600dia spun piles. |
Software
Used: STRAP
|

Precast T-Beam
made Continuous:
Span 36m x 4 spans per
module
|
|
Animal Viaducts, Aring, Terengganu: Designed Remedial
Method for Under-Strengthen Bridge T-Beams (Completed)
 |
Re-analysed the bridge structures based on the actual modulus of elasticity of
beam. |
 |
Designed the remedial method to strengthen the T-beams. |
Software Used: STRAP
|
Pretensioned M-Beam made
Continuous: 5-Span Continuous
14/22/19/21/22/18m
|
|
UE3 Access
Ramp: 5-Span Precast Pretensioned M-Beam made Continuous
(Completed)
 |
Analysed and designed the bridge as 5-span continuous bridge. |
 |
Designed the foundation as micropile. |
Software
Used: ADAPT ABI & STRAP
|