Project Reference                                                                     < Prev  1 2 3 4 5 6 7  Next >
     

 USJ-KESAS Flyover, Selangor
  RC Twin Rib Bridge: Span 15/18/13/13/15/12m

 

USJ-KESAS Flyover, Selangor: RC Twin Rib Integral Bridge (Completed)

Analysed and Designed RC full integral bridge with twin rib on pile bent foundations.
Designed abutment with monolithic connections and pile bent, 600dia spun piles.

      Software Used: STRAP

 

Animal Viaducts, Aring, Terengganu
          Precast T-Beam made Continuous:
            Span 36m x 4 spans per module

 

 

Animal Viaducts, Aring, Terengganu:  Designed Remedial Method for Under-Strengthen Bridge T-Beams (Completed)

Re-analysed the bridge structures based on the actual modulus of elasticity of beam.
Designed the remedial method to strengthen the T-beams.

      Software Used: STRAP

 

UE3 Access Ramp 
     Pretensioned M-Beam made Continuous:
      5-Span Continuous 14/22/19/21/22/18m

 

 

UE3 Access Ramp: 5-Span Precast Pretensioned M-Beam made Continuous  (Completed)

Analysed and designed the bridge as 5-span continuous bridge.
Designed the foundation as micropile.

      Software Used: ADAPT ABI & STRAP

 

 

 

 

 

                                                                        < Prev  1 2 3 4 5 6 7  Next >