Box Girder Bridge: Span
95/165/95m
|
|
Seredeng Bridge, Sibu,
Sarawak: Temporary Fixity System to Stabilise Bridge During Balanced Cantilever
Construction (Completed)
 |
Design of temporary fixity to stablise the bridge during construction for box girder
bridge supported on bearing but built with balanced cantilever construction. The bridge
was designed to have segments cantilevered 82m from pier during construction
stage. |
 |
Pre-camber analysis and prepared pre-camber chart. |
Software
Used: ADAPT ABI & STRAP
|

Steel Suspension Bridge: Span
68/8/9/11m
|
|
Suspension Bridge, Broga, Selangor: Pedestrian Bridge
with Main Span 68m (Completed)
 |
Analysed and designed the suspension bridge as flexible deck structure. |
 |
Designed the 30m pylon, foundation with micropiles and wire rope anchoring system at
abutments. |
 |
Construction stage analysis. |
Software Used: STRAP
|

Box Girder Bridge: Span
60/100/60m
|
|
Sg. Padas Bridge, Beaufort,
Sabah: Box Girder Bridge by Balanced Cantilevered Method
(Completed)
 |
Designed temporary stabilization system during construction stage because the bridge is
supported on bearings at intermediate piers. |
 |
Pre-camber analysis and prepared pre-camber chart. |
 |
Construction stage stability analysis. |
Software
Used: ADAPT ABI
|