 Seredeng Bridge, Sibu, Sarawak
         Box Girder Bridge: Span 95/165/95m

 

Seredeng Bridge, Sibu, Sarawak: Temporary Fixity System to Stabilise Bridge During Balanced Cantilever Construction (Completed)

Design of temporary fixity to stablise the bridge during construction for box girder bridge supported on bearing but built with balanced cantilever construction. The bridge was designed to have segments cantilevered 82m from pier during construction stage.
Pre-camber analysis and prepared pre-camber chart.

      Software Used: ADAPT ABI & STRAP

 

Suspension Bridge, Broga, Selangor
       Steel Suspension Bridge: Span 68/8/9/11m

 

 

Suspension Bridge, Broga, Selangor: Pedestrian Bridge with Main Span 68m (Completed)

Analysed and designed the suspension bridge as flexible deck structure.
Designed the 30m pylon, foundation with micropiles and wire rope anchoring system at abutments.
Construction stage analysis.

      Software Used: STRAP

 

 Sg. Padas Bridge, Beaufort, Sabah
         Box Girder Bridge: Span 60/100/60m

 

 

Sg. Padas Bridge, Beaufort, Sabah: Box Girder Bridge by Balanced Cantilevered Method (Completed)

Designed temporary stabilization system during construction stage because the bridge is supported on bearings at intermediate piers.
Pre-camber analysis and prepared pre-camber chart.
Construction stage stability analysis.

      Software Used: ADAPT ABI

 

 

 