Project
Reference
|
|
< Prev 1 2 3 4 5 6 7 Next > |
|
|
|

Box Girder
Bridge: Span 65/120/65m
|
|
Sg. Sebelak Bridge, Roban,
Sarawak: Box Girder Bridge by Cantilever Construction Method where Anchors Spans
Casted before Cantilevering (Completed)
 |
Alternative design of the bridge to standardize segment lengths and detailed additional
top blisters to anchor spans. |
 |
Pre-camber analysis and prepared pre-camber chart. |
 |
Construction stage stability analysis. |
Software
Used: ADAPT ABI & STRAP
|

Box Beams Made Monolithic: Span 25/32/26m
|
|
Juru Ramp Bridge, Penang: Precast Box Beam Made
Monolithic with Piers (Completed)
 |
Alternative design of the bridge to adopt precast box beams and made monolithic with
piers. |
 |
To extend the span lengths, prestressed hammerheads are casted first and later precast
beams are dropped in for stitching as a monolithic structure. |
Software Used: ADAPT ABI &
STRAP
|

Steel Arch Bridge on Concrete Buttress: Span
80m
|
|
Pulau Bunting Bridge,
Kedah: 80m span basket-handled bow-string steel arch with composite deck slab
which involved off site fabrication & Assembly and Lifted to position from barge
(Completed)
 |
Designed bridge structures at various construction stages and advised on the
construction method. |
 |
Designed and planned for the heavy lifting of the steel arch in position. |
Software
Used: STRAP
|
< Prev 1 2 3 4 5 6 7 Next >
|