Box Girder Bridge: Span 40/75/40m
|
|
Trusan Sapi Bridge, Sabah: Design Check and Assessment on Balanced Cantilever Box Girder
Bridge (Completed)
 |
Design check and assessment on the bridge. |
 |
Carried out precamber analysis and bridge stability check during construction
stage. |
Software Used: ADAPT ABI & STRAP
|

Steel Arch Bridge: Curve Span 45m
|
|
Iconic Bridge, Terengganu: Design of Single Plan Steel Arch with Truss Deck of Curve Length
45m (Completed)
 |
Analysed and designed the steel structures as a fixed arch with cable hangers. |
 |
Designed the foundations as integral bridge. |

Software Used: STRAP
|

Box Girder Bridge on Double Leaf Piers:
Span 70/100/70m
|
|
Tasek Kenyir Bridge,
Terengganu: Alternative Design of Prestressed
Balanced Cantilever Box Girder Bridge with Main Span 100m and side span 70m
(Completed)
 |
Analysed and proposed alternative design on the prestressed reinforcement. |
 |
Pre-camber analysis and prepared pre-camber chart. |
 |
Analysed and designed the closure pour temporary works. |
Software
Used: ADAPT ABI & STRAP
|